CASE STUDY
Enhanced Reliability for 10-Inch Globe Valve Body
Leading Pump Manufacturer for Large-Scale Industries & Projects
Coimbatore, Tamil Nadu
Challenge
• Cracks caused by thermal stress at the parting line junction
• Casting shrinkage and defects leading to leaks
• Increased fettling and rework time
our solution
Through advanced thermal stress analysis, we pinpointed design weaknesses and optimized the casting process:
• Added stress relief pads at critical parting line junctions to redistribute thermal stresses
• Incorporated riser chills to minimize shrinkage and prevent cracks
Precision-Engineered Valves & Pumps Components by Sevenloop
Valve Bodies
Impellers
Seals
Casing
From Design, All the Way to Delivery